Plan & specify
Start with the floor plan, intended use, dimensions, openings, and finish schedule. Confirm the scope before fabrication begins.
Understand the steps behind a converted container—and the details to confirm for your own build.
Discuss your build
This is a guide to the production process. The fabrication facility, build method, inspection documents, and lead time are confirmed for your particular order.
Start with the floor plan, intended use, dimensions, openings, and finish schedule. Confirm the scope before fabrication begins.
The project specification sets out the steel frame, structural alterations, and openings. Ask for the drawings relevant to your configuration.
Insulation, interior surfaces, doors, glazing, and utility provisions depend on the selected model and agreed build scope.
Review the finished configuration, equipment list, and any outstanding site work before the unit is scheduled for delivery.
Coordinate freight, route access, unloading equipment, and the prepared base so the delivery plan suits your location.
Share the site location, intended use, layout, and finish requirements. For occupied structures, confirm the local permit, foundation, and utility requirements with the appropriate professionals.
Your written quote should identify the supplied components, installation responsibilities, delivery method, and any documentation included.
Start a custom project